A seawall is a critical structure that protects coastal properties from erosion and water damage. If you're planning to build a seawall, knowing the cost beforehand is essential. Our Seawall Cost Calculator helps estimate expenses based on materials, labor, and additional costs.

How to Calculate Seawall Cost?

The total cost of building a seawall depends on the dimensions, material costs, labor costs, and extra expenses. Here's the step-by-step calculation process:

1. Calculate Seawall Volume

To determine the amount of material needed, we calculate the seawall's volume:

V=L×H×WV = L \times H \times W

Where:

  • VV = Volume in cubic feet
  • LL = Length of the seawall (ft)
  • HH = Height of the seawall (ft)
  • WW = Width of the seawall (ft)

2. Convert Volume to Desired Unit

Depending on the material cost unit, volume needs to be converted:

Cubic Meters (m³):

Vm3=V×0.0283168V_{m^3} = V \times 0.0283168

Cubic Yards (yd³):

Vyd3=V27V_{yd^3} = \frac{V}{27}

3. Calculate Material Cost

Material cost is calculated based on the selected unit:

Cm=Cunit×VconvertedC_m = C_{unit} \times V_{converted}

Where:

  • CmC_m = Total material cost
  • CunitC_{unit} = Cost per cubic unit (m³, yd³, or ft³)
  • VconvertedV_{converted} = Volume in the corresponding unit

4. Calculate Labor Cost

Labor cost depends on how workers charge:

Per foot:

CL=Cper_ft×LC_L = C_{per\_ft} \times L

Per meter:

CL=Cper_m×(L×0.3048)C_L = C_{per\_m} \times (L \times 0.3048)

Fixed project rate:

CL=CfixedC_L = C_{fixed}

5. Calculate Total Cost

The final cost is calculated as:

Ctotal=Cm+CL+CextraC_{total} = C_m + C_L + C_{extra}

Where:

  • CtotalC_{total} = Total seawall cost
  • CextraC_{extra} = Additional costs (permits, site preparation, etc.)

Example Calculation

Let's say we need to build a seawall with:

  • Length = 50 ft
  • Height = 6 ft
  • Width = 2 ft
  • Material cost = $100 per yd³
  • Labor cost = $20 per foot
  • Additional costs = $500

Step 1: Calculate Volume

V=50×6×2=600 ft3V = 50 \times 6 \times 2 = 600 \text{ ft}^3

Step 2: Convert Volume to Cubic Yards

Vyd3=60027=22.22 yd3V_{yd^3} = \frac{600}{27} = 22.22 \text{ yd}^3

Step 3: Material Cost

Cm=100×22.22=2222C_m = 100 \times 22.22 = 2222

Step 4: Labor Cost

CL=20×50=1000C_L = 20 \times 50 = 1000

Step 5: Total Cost

Ctotal=2222+1000+500=3722C_{total} = 2222 + 1000 + 500 = 3722

Thus, the total estimated seawall cost is $3,722.


Final Thoughts

A Seawall Cost Calculator simplifies estimating construction expenses, ensuring you stay within budget. Use our tool to get an accurate cost breakdown before starting your project!